Meridian Quality Shower ConversionsMeridian, ID

Bathroom Conversion in Meridian, Idaho

The whole wet wall, the floor at the old tub, and the door swing. More than a surround kit.

Free estimate.

  • Free estimates
  • Treasure Valley
  • Local crew
  • One number

Get a free estimate

(208) 274-7129

This job covers

  • Primary bath wet-wall rebuild
  • Hall bath conversion with floor patch
  • Door swing and toilet clearances
  • Wet wall plus floor, vanity stays

Bathroom Conversion in Meridian, Idaho

Meridian Quality Shower Conversions handles bathroom conversion in Meridian when the stall change is not enough and the wet wall, the floor at the old tub, and the door have to move with it. A bathroom tub to shower ask that also names the floor and the swing belongs here.

Call (208) 274-7129 with photos of the whole room, not just the apron. We quote the wet wall and the floor patch.

Bathroom Conversion Options for Meridian Properties

This is a room, not a kit. Primary wet-wall rebuilds, hall-bath conversions with a floor patch, door-swing fixes, and a layout that keeps the vanity each change the bid.

Primary bath wet-wall rebuild

Suite baths in newer plats want the tub gone, the wall open, and the stall built as a system. Vanity often stays. We still check the door and the toilet. Glass is picked after the curb, not from a mood board.

Hall bath conversion with floor patch

The 60-inch combo comes out. A stall that is narrower leaves a patch. Vinyl plank and tile do not hide a lip. We finish that rectangle. A raw patch is not a converted bath.

Door swing and toilet clearances

A curb where an apron was can catch a door. Bypass glass can save a reverse. A closet flange move is last, not first. We measure both before demo.

Wet wall plus floor, vanity stays

Owners want the stall and the floor at the tub, not a full gut. The vanity remains. The wet wall still opens. This is the common "do not touch the rest" job that still is more than a surround.

How We Handle Bathroom Conversion in Meridian

  1. We photograph the room: stall, toilet, door, vanity, and floor at the apron.
  2. Demo is the tub and the wet wall. Floor at the tub is opened as far as the new pan needs.
  3. Pan, membrane, valve, flood test. Floor patch where the apron was.
  4. Finish, glass, and a door tweak if the swing fights the curb. You use it after the cure date.

Materials and Methods

A room conversion still lives on stall details. Listed pan or mortar bed, ANSI A118.10 membrane, cement board, mixing valve to ASSE 1016, International Plumbing Code on trap and scald. Floor patch uses a backer that belongs in a wet room. Silicone at stall joints. Door hardware is a separate line when we rehang. We do not treat a kit flyer as a layout. We do not leave a step of subfloor in the walk path.

What Bathroom Conversion Costs in Meridian

Angi shower remodel work averages near $7,000 ($2,000 to $9,000). Tub-to-shower guides on Angi run $1,200 to $15,000. HomeAdvisor often lists $1,500 to $8,000 for conversions. Floor patch, a moved toilet, and tile versus acrylic move this page above a kit-only number. We quote the room you showed us.

Wet-wall rebuilds when the floor is open

Once the tub is out, the floor talks. South Meridian fill can leave a dip under the apron. Old Town baths can show mixed subfloor. A bathroom conversion that ignores that dip sets a pan on a wave.

We flatten or we sister. Then the pan. Then the walls. A franchise liner never sees that floor. We do.

Call (208) 274-7129 with a full-room photo when the job is more than a surround.

Questions

How do I get a bathroom conversion estimate in Meridian?

Send photos of the whole bath, the city, and whether the toilet and vanity stay. We quote the wet wall, the floor at the tub, and any door swing change. A surround-only kit is a smaller job. Layout changes need a plan before demo. Same week looks in most cases.

Is a bathroom conversion just a tub to shower swap?

The stall is the core. This page adds the floor patch, the wet wall rebuild, and clearances at the toilet and the door. If you only want the alcove converted and the rest of the room left, say that. We will not open a vanity you did not put on the call.

Do you move a toilet as part of this?

Only if the new curb or glass fights the bowl. Moving a closet flange is plumbing and a floor patch. Many production baths can keep the toilet if we pick bypass glass. We measure that before anyone cuts the flange.

What about the bath floor where the tub sat?

A 60-inch apron hides a rectangle of subfloor and finish. A smaller stall leaves a hole. That patch has to match the room. Vinyl, tile, or a listed sheet: we name it on the quote. Leaving raw subfloor in a bath is not a finished conversion.

Does the door swing into the new stall?

Some production baths already fight a tub apron. A curb and a pivot door can make that worse. We check the swing. A bypass or a curtain can save a door reverse. Rehanging a door is on this page when the stall needs it.

What do cost guides say for this scope?

Angi shower remodel averages sit near $7,000 with a $2,000 to $9,000 band. Conversion guides run $1,200 to $15,000 depending on tile and layout. HomeAdvisor conversion work is often $1,500 to $8,000. Floor patch and a moved toilet sit on top. We quote this room.

Ready for a shower conversion estimate in Meridian?

Tub out, shower in. Tile or acrylic. Free estimate, no obligation.

Call (208) 274-7129 Get an estimate